Musheireb Heart of Doha Project – Phases 2 & 3
Ammico’s scope of work comprised the design and installation of the shoring system, piling, excavation, and dewatering for the basement structure. The major elements of the works were as follows:
Construction of diaphragm walls, 800 mm thick and 19 m to 23 m deep, with a total length of 850 m
Construction of secant pile walls, 800 mm in diameter and 18 m deep, with a total length of 100 m
Installation of removable ground anchors
Installation of 900 mm diameter bored piles, 9 m in length (2,385 nos.)
Installation of 1,500 mm diameter bored piles, 11 m in length (209 nos.)
Installation of 1,800 mm diameter bored piles, 13 m in length (837 nos.)
Excavation works with a total volume of approximately 1,901,406 cubic metres, including disposal
Provision of five basement levels
Installation and maintenance of a complete dewatering systemrised the design and installation of the shoring system, piling, excavation, and dewatering for the basement structure. The major elements of the works were as follows:
Ammico is an established geotechnical contractor over five decades of international experience. Ammico has expertise in the installation of bored piles, shoring works, ground improvement solutions, ground anchors, marine piling, and earthworks. We have emerged as a leader in deep diaphragm wall installation works.
CLIENT
Qatar Rail
CLIENT
Qatar Rail
MAIN CONTRACTOR
MAIN CONTRACTOR
LOCATION
Doha, Qatar
LOCATION
Doha, Qatar
SOLUTIONS
Diaphragm Wall
Ground Anchors
SOLUTIONS
Diaphragm Wall
Ground Anchors
START DATE
July 2014
START DATE
July 2014
COMPLETION DATE
December 2014
COMPLETION DATE
December 2014
Saudi Arabia
U.A.E.
© 2026 Ammico Contracting W.L.L. All rights reserved. Design By: Deven Web Studio


Saudi Arabia
U.A.E.
© 2026 Ammico Contracting W.L.L. All rights reserved. Design By: Deven Web Studio


Saudi Arabia
U.A.E.
© 2026 Ammico Contracting W.L.L. All rights reserved. Design By: Deven Web Studio